Electric Service Installations

This page is currently undergoing renovation. If you have questions please call us at 360-452-9771 or 800-542-7859 and we will refer you to a PUD Serviceman.

Are you L&I approved and ready to connect an electric meter to a meter base? If so, you may skip to Step 2.

1.    New electric installation to a property?  Please submit the applicable Electric Installation Construction Estimate form. If you are requesting information about Water (i.e. availability to a property or a service estimate) please complete our online Water Estimate/Availability Request form).

  • Customer chooses between Residential Electric Installation and Commercial Electric Installation.
  • Customer chooses their service territory; options being Forks, Clallam Bay/Neah Bay/Sekiu, Port Angeles, Sequim.

 (If you are unsure which service territory, please use this map to determine)

  • “Residential” then https://clallampud.net/wp-content/uploads/2023/04/Residential4.pdf (in Formstack form version)
  • “Commercial” then https://clallampud.net/wp-content/uploads/2023/04/Commercial4.pdf (in Formstack form version)

 

2.   Meter ready to be connected? Please submit the Electric New Connect Request form. This will require the Labor & Industry permit number (usually submitted by the electrician or contractor).

Please read the following before completing this form:

Temporary Service connects:

  • Customer must have an estimate from the PUD Serviceman. If the fees have not been paid, costs may change based on date of estimate.
  • Location must have an assigned 911 address
  • Once L & I has approved, fill out and submit the form below.

Temporary moving to Permanent Service connects:

  • Location must have an assigned 911 address if it is not already provided
  • Once L & I has approved, fill out and submit the form below.

Permanent Service connects:

  • Customer must have an estimate from the PUD Serviceman. if the fees have not been paid, costs may change based on date of estimate.
  • Location must have an assigned 911 address if it is not already provided
  • Once L & I has approved, fill out and submit the form below.

Existing service connects that have been disconnected for more than 12 months:

  • Location must have an assigned 911 address if it is not already provided
  • Verify if any meter base work has been identified by the PUD before reconnecting service.
  • Once L & I has approved, fill out and submit the form below.

 

3. Need to apply for a PUD account to begin your service?

New Residential account

New Commercial account 


For Developers: 

Economic Development Power Capacity Map

The Economic Development Power Capacity Map (EDPCM)  is available for developers, and it provides approximate locations in the Clallam PUD service territory that can provide power at various levels with costs for off-site electric system infrastructure in an amount usually under $10,000/MW. Capacities given may change over time, and no guarantees given related to system upgrade costs. Please contact Clallam PUD engineering department to verify available capacity.  To realize the substation capacity will incur additional line extension cost that will increase as the distance from the substation increases.

Legend

  • Substation Capacity represents available capacity of substation transformer (1.1 pu).
  • MW Capacity Remaining represents available line capacity color coded by MW.
  • 1 MW = 1000KW